Yaskawa Motoman – Replace (8) 25-ton Package Rooftop Units

Location

Miamisburg, OH

Completion

April 2026

Client

Yaskawa Motoman

Rieck Services helped Yaskawa Motoman replace eight rooftop units serving its robotics manufacturing facility without interrupting day-to-day operations. The project also included fully integrating the new equipment with the facility’s existing Building Automation System (BAS). Automated Solutions Group managed this complex integration, which required coordinating eight existing units and eight new units operating on the same system bus.

Because the units were located nearly 200 feet from the roof’s edge, D-Crane developed and executed a detailed lift plan that allowed all eight units to be disconnected and set within two days. The lifts were completed from two sides of the building to safely and efficiently reach each location. Custom mesh coil screens were also installed to protect the new equipment from the heavy cottonwood buildup the facility experiences each spring due to its proximity to the highway.

  • Rooftop Unit Replacement
  • Building Automation Systems (BAS) Integration
  • D-Crane Lift Execution
  • Installed Mesh Coil Screens for Environmental Factors